titles_blaisdell.png



Agenda

Student Portfolio Page
Week01.gif
week of

Feb 1-5 Introduction

  • Mon - PA Day - Off
  • Tue - Welcome to TDJ20 - Introduction
    • Course outline
    • Introductory Questionnaire
    • Requirements:
      • Computer User ID and Password. USB?
      • Please pick a spot to work and keep that seat for the semester - These machines are "off grid" so to speak - They save locally
      • Binder, Pencil and Paper
      • A good attitude!
  • Wed - Orthographic and Isometric Drawing (Using the Wiki!)
  • Thu - Exercises - Isometric drawings
    • Orthographic Drawing practice - Making Plans
    • Drawing Package - take-up Sheet B8 - measurement
    • Please complete sheets D1\D2
    • Google Docs login procedure has changed: see here.
  • Fri - Let's finish sheets D8, D27 , D3 & F1
Week02.gif
week of

Feb 8-12 Portfolios and Inventor

  • Mon - Finishing drafting packages
    • Before you start work on your computer - Please add This Agenda page to your Permanent Toolbar - Bookmark this page please
    • Inventor tutorial - Let's have a look at Inventor: Interface, sketch panel, tools, dimensioning, model mode, etc.
    • Our first project will get us used to the software and will involve a Rim Design
    • Don't forget to make a Folder for yourself - LASTNAME - on the E:\ of your computer - BE MINDFUL OF WHERE YOU SAVE!
    • Getting started with Inventor - Rim design
  • Tue - Continue Rim Design
    • Making tires (another ipt), Assemblies and Presentation drawings IAM's and idw's
    • Assembly drawings and constraining
    • Continue on the Rim Design Assignment
  • Wed - Portfolios - Please Create your portfolio - Send me the link when you're done!! Share with me (co-owner)
    • Bookmark in your toolbar this wikipage
    • Please use My Template for this class only TDJ20 - Blue background
    • How do you put a copy of your Finished Rim on your web page?
    • When the rim is complete, save a jpg to your portfolio (TODAY'S Tutorial)
    • If finished Rim, complete the drawings in your drawing package.
  • Thu - Safety - Let's get started!
    • For all of our safety lessons: Please add a page to your portfolio (UNDER HOME) called "Safety" - Here we will
    • general shop tour
  • Fri - PA day
Week03.gif
week of

Feb 15-19 Safety

  • Mon - Family Day
  • Tue - Snow Day
  • Wed - Snow Day 2
  • Thu - Let's Begin Safety today - Your Drafting packages will be due this Friday
  • Fri - Safety - Planer and the Jointer
*
Week04.gif
week of

Feb 22-26 Safety and BBG Machine

  • Mon - Safety - Sanders (Belt, Disc and Spindle)
  • Tue - Safety - Mitre Saw, Scroll Saw
  • Wed - Introduce BBG project
  • Thu - Safety test
    • Begin Research and Design
  • Fri - Continue research and design
    • Don't forget to post Research and Designs to Portfolio
Week05.gif
week of

Feb 29-Mar 4 BBG

  • Mon -Safety Re-test
    • Safety Video - Watch this
    • retests - Nasib, Daniel, Pardeep, Abel, Keegan, Justin (1st attempt)
    • If you've passed the safety test, work on your portfolio, and Inventor designs
    • Procedure list to portfolio
  • Tue - BBG design and portfolio - Finished?
  • Wed - BBG Construction
  • Thu - Literacy Prep day
    • Prepare for the OSSLT
  • Fri - BBG Construction
Week06.gif
week of

Mar 7-11 BBG

  • Mon -I'm away today at a workshop - Bush Camp Chair
    • Begin to design our next project- the Bush Camp Chair
    • Inventor - draw, assemble and post the pieces to your portfolio
    • Design - see here
      • Remember to keep the design Clean and Simple
      • Resolution - Size - Degree of Detail
      • Find the largest (most pixels) logo possible
      • Edit with Photoshop to customize
      • Save ALL of your possible designs in the Research section of your portfolio
      • Let's get a start on this today
  • Tue - BBG Construction continues
  • Wed - BBG Construction
  • Thu - BBG Construction
  • Fri - BBG Construction
    • HAVE A NICE MARCH BREAK!!
Week07.gif
week of

Mar 21-25 BBG wrap up

  • Mon - BBG construction Continues
  • Tue - BBG construction Continues
  • Wed - BBG construction Continues
  • Thu - BBG construction Continues
  • Fri - Good Friday
Week08.gif
week of

Mar 28-Apr 1 BBG Finish

  • Mon - Easter Mon
  • Tue - Last day in the shop for BBG
  • Wed - BBG Reflection - Edit your portfolios
  • Thu - BushCamp Chair begin
    • MasterCAM tutorial
    • Edit Portfolio pages - Research 3 designs, design on Inventor
  • Fri - Chair design + Tutorial
Week09.gif
week of

Apr 4-8 Bush Camp Chair

  • Mon - Chair design and Logo creation
    • work on designs
    • Lamination, Design & Construction
  • Tue - Work on designs for Chair back
    • designs for chairs
    • Please complete portfolios
  • Wed - Chair Construction
    • lamination, design
  • Thu - Chair Lamination Tutorial
    • lamination, design and construction
  • Fri - Chair Construction
Week10.gif
week of

Ap 11-15 Bush Camp Chairs

  • Mon - Chair construction
  • Tue - Chair construction
  • Wed - Chair construction
  • Thu - Chair construction
  • Fri - Chair construction
Week11.gif
week of

Apr 18-22 Bush Camp Chairs

  • Mon - Chair Construction
  • Tue - Chair Construction
  • Wed - Chair Construction
  • Thu - Chair Construction
  • Fri - Chair Construction
Week12.gif
week of

Apr 25-29 Finish Chairs

  • Mon - Chair Construction
  • Tue - Chair Construction
  • Wed - Chair Construction
  • Thu -Last Day for Bush Camp Chairs is Tomo
  • Fri - Final day Chairs
    • Monday - Begin Joinery
Week13.gif
week of

May 2-6 Joinery Start

  • Mon - Introduction
    • Please make sure your Bush Camp Chair is on the Mezanine Table (w/ name)
    • Joinery Project
  • Tue - Joinery Fame Design
  • Wed - Joinery Frame Design
  • Thu - Joinery Frame Design
  • Fri - Start Joint Frame Construction
    • Stock prep from the scrap bin (minimum 3/4" thick and 1-1/2" wide)
    • To go into the shop you need:
      • Completed and posted to Portfolio - Research, Inventor designs, Procedure
Week14.gif
week of

May 9-13 Joinery

  • Mon - Begin construction of joint frame
  • Tue - Joinery
  • Wed - Joinery
  • Thu - Joinery
  • Fri - Joinery
Week15.gif
week of

May 16-20 Joinery End

  • Mon - Joinery
  • Tue - Joinery
  • Wed - Joinery
  • Thu - Joinery
  • Fri - Last day - Finishing Joinery
    • When complete put all joint frames (taped together - NO glue) on mezanine table
Week16.gif
week of

May 23-27 Summative - Foot Stool

  • Mon - Introduction and Description -
    • The footstool project is described here.
    • Material Constraint - 60 linear inches of 1 x 4 pine. If you are using something other than pine for the legs, you must supply these(i.e. twigs, hockey sticks, etc)
    • Design is due Friday May 27 - Research, Inventor, procedure, MasterCAM, etc ALL on portfolio
    • Work in the shop starts Monday May 30
    • Due date - (to be finalized) tentatively Fri Jun 17 - Including Reflection and completed portfolio
    • One week design, three weeks build
  • Tue - Research
  • Wed - Design
  • Thu - Design
  • Fri - Design
Week17.gif
week of

May 30 - Jun 3 Summative

  • Mon - Summative construction
  • Tue - Summative construction
  • Wed - Summative construction
  • Thu - Summative construction
  • Fri - Summative construction
Week18.gif
week of

Jun 6-10 Summative

  • Mon - Summative construction
  • Tue - Summative construction
  • Wed - Summative construction
  • Thu - Portfolio Catch up day
    • Please see that your portfolio is up to date - ALL projects - research, drawings, reflections posted to your portfolio
  • Fri - Summative construction
Week19.gif
week of

Jun 13-17 Summative

  • Mon - Summative construction
  • Tue - Summative construction
  • Wed - Summative construction
  • Thu - Summative construction
  • Fri - Summative is due here